AXIS a.s.

your location: Who we are References Others references

Others references

Project: Relocation of mixing unit and production line

  • Investor: PEPSI CZ, s.r.o.
  • Year, location: 2011, Praha, Czech Republic

Relocation of mixing unit and production lineRelocation of mixing unit and production lineRelocation of mixing unit and production line

 

 

 

 

 

 

Project: Hydrogen plant incl. CO2 Removal unit. Supply, prefabrication and installation of IN & OFF SKID Technology

  • Investor: ZVU Engineering a.s.
  • Year, location: 2011, Hradec Králové, Czech Republic

Hydrogen plant incl. CO2 Removal unit. Supply, prefabrication and installation of IN & OFF SKID TechnologyHydrogen plant incl. CO2 Removal unit. Supply, prefabrication and installation of IN & OFF SKID TechnologyHydrogen plant incl. CO2 Removal unit. Supply, prefabrication and installation of IN & OFF SKID Technology

 

 

 

 

 

Project: Installation of air cooling system (STYREN) in rafinery

Installation of air cooling system (STYREN) in rafineryInstallation of air cooling system (STYREN) in rafineryInstallation of air cooling system (STYREN) in rafinery

 

 

 

 

 

Project: Installation of plant structural steelwork "SAICA PM11 ERB"

  • Investor: SIEMENS AG Austria
  • Year, location: 2011, Partington, United Kingdom

Installation of plant Structural Steelwork "SAICA PM11 ERB"Installation of plant Structural Steelwork "SAICA PM11 ERB"Installation of plant Structural Steelwork "SAICA PM11 ERB"

 

 

 

 

 

Project: Modification and extension of packing line in dairy plant

  • Investor: Mlékárna Hlinsko, s.r.o.
  • Year, location: 2011, Hlinsko, Czech Republic

 

Project: Installation of technology in foundry plant, Installation of moulding line in foundry plant

  • Investor: KASI, spol. s r.o.
  • Year, location: 2010- 2011, Nový Bydžov, Czech Republic

Installation of technology in foundry plant, Installation of moulding line in foundry plantInstallation of technology in foundry plant, Installation of moulding line in foundry plantInstallation of technology in foundry plant, Installation of moulding line in foundry plant

 

 

 

 

 

Project: Installation of piping fittings and secondary steel structure

  • Investor: Thyssenkrupp Steel, USA
  • Year, location: 2010- 2011, Calvert, Alabama, USA

Installation of piping fittings and secondary steel structureInstallation of piping fittings and secondary steel structureInstallation of piping fittings and secondary steel structure

 

 

 

 

 

Project: Installation of steam & condensate piping, heat exchangers

  • Investor: Volkswagen Emden
  • Year, location: 2010, Emden, Germany

 

Project: Dismantling and assembly of reactor with catalyst change out in H301

  • Investor: BorsodChem MCHZ, Ostrava
  • Year, location: 2010, Ostrava, Czech Republic

Dismantling and assembly of reactor with catalyst change out in H301Dismantling and assembly of reactor with catalyst change out in H301Dismantling and assembly of reactor with catalyst change out in H301

 

 

 

 

 

Project: Dismantling and assembly of SULFOX technology

  • Investor: GLANZSTOFF- BOHEMIA, s.r.o.
  • Year, location: 2010, Lovosice, Czech Republic
  • Year, location: 2009, Sankt Pölten, Austria

Dismantling and assembly of SULFOX technologyDismantling and assembly of SULFOX technologyDismantling and assembly of SULFOX technology

 

 

 

 

 

 

Project: Assembly of DETEX technology incl. piping

  • Investor: GLANZSTOFF- BOHEMIA, s.r.o.
  • Year, location: 2009, Lovosice, Czech Republic

Assembly of DETEX technology incl. pipingAssembly of DETEX technology incl. pipingAssembly of DETEX technology incl. piping

 

 

 

 

 

Project: Supply and assembly of technology SACMI

  • Investor: LASSELSBERGER, a.s.
  • Year, location: 2009, Rakovník, Czech Republic

Project: Dismantling of Chemical plant - Mixing station

  • Investor: Hexion Speciality Chemicals Sweden AB
  • Purchaser: CWS Germany, 2007

Project: Installation of Mixing plant including of conveyers and process piping

  • Investor: IMERYS, Belgian
  • Purchaser: MillWide , U..K., 2007

Project: Installation of new plant Flexfill - installation of equipment and process piping

  • Investor: Flexfill, USA
  • Purchaser: CHEMING Pardubice
  • Year, location: 2006/ 2007, Czech Republic

Project: Installation of Air Condensate Plant

  • Investor: Vattenfall, Hamburg Germany
  • Purchaser: Bronswerk Heat Transfer, Czech Republic
  • Year, location: 2007, Germany

Project: Installation of Press and Polishing line No. 1 for technical stone

  • Investor: Magdeburg Artolith, Germany
  • Purchaser: BRETON, Italy
  • Year, location: 2007, Germany

Project: Installation of Air Condensate Plant

  • Investor: EVN Austria
  • Purchaser: Bronswerk Heat Transfer
  • Year, location: 2006, Austria

Project: Supply and installation of Paint Circulation System HV & LV

  • Investor: Toyota Peugeot Citroën Automobile Czech, s.r.o. (TPCA)
  • Purchaser: HOCHTIEF VSB a.s. & AECON Industrial, Canada
  • Year, location: 2004-2005, Kolín, Czech Republic

Project: Fabrication and installation of Process Tanks for TTS and Cata line

  • Investor: Peugeot Citroen Automibiles Slovakia s.r.o. (PSA)
  • Purchaser: Haden Drysys Internationale Limited
  • Year, location: 2004-2005, Czech Republic

Project: Fabrication of motorway bridges for toll collecting

  • Investor: Toll Collect GmbH, D-10875 Berlin
  • Purchaser: Komel Deutschland GmbH
  • Year, location: 2003, Czech Republic

Search

advanced search »

copyright © 2008 - 2012 AXIS a.s. - All rights reserved
design by IVEPA s.r.o. © 2008 - All rights reserved
powered by WebWorks WebCreator CMS